TESTING & INSPECTION
Every pour is verified.
From alloy chemistry to internal soundness, each release decision is supported by a named test and a visible record.
Explore the equipment QUALITY CONTROL / RENYI LAB 08 methods
INSPECTION CAPABILITIES
Four questions before a part is released.
01What is in the alloy?
02Does it carry the load?
03Is it sound inside?
04Does it match the drawing?
INSPECTION CAPABILITIES